This tool follows the risk assessment methodology described in the "Risk assessment decision making tool for building control bodies" guidance document.
Project Information
Risk Assessment
Start with medium risk (3 points), then adjust based on factors below
Positive Factors (deduct 1 point for each, minimum score of 1):
Negative Factors (add 1 point for each, maximum score of 5):
Risk Assessment Results
Stage Assessment
Based on the risk assessment, the following stages should be included in your inspection schedule:
Stage
Applicable
Priority
Include in Schedule
Service Schedule
Project:
Address:
Reference:
Builder:
Risk Level:
Expected Number of Visits:
Stages to be Notified
Stage
Notification Requirements
Visits
Special Notes
Date Issued:
The person carrying out the building work is required under the building regulations to notify the Building Control Officer of these stages of the work so that they can be inspected. Failure to notify stages in the service schedule would constitute a breach of the building regulations.